Address: #8, HIG, Near Global College, KHB Colony, Kolar-563101
Business hours: 9:00AM - 6:30PM
The above cost includes all applicable taxes.
The floor plan and elevation must be finalized within 30 days from the date of releasing the first-floor plan proposal by the architect.
SSM below the plinth is not included; if required, it will be charged based on actual costs.
Anti-termite treatment will adhere to standard procedures.
Steel & Cement price will be considered as per agreement date, if there is a major fluctuation exceeding 5% of the average market price at the time of purchasing, the difference shall be charged in consultation with the client.
Sewer line connection to the main drain line is included up to 10 feet from the building.
The client must provide water and electricity for the work. Rates are based on natural earth excavation. Additional charges will apply for concrete structures, stones, rock slush, or any other obstacles encountered during excavation.
The cost assumes that the site and road are at the same level.
This package does not include equipment, machinery, or fixtures such as sump pumps, solar panels, tanks, geysers, or bulbs.
The client will bear the approval costs for power and water. Road cutting charges for connecting electricity and sewage lines are not included and will be charged additionally.
Costs for purchasing new earth or removing existing earth for excavation/backfilling purposes will be charged based on actual costs.
Liaison assistance with BBMP/BDA/BMRDA and similar authorities will be provided by the company, with fees to be borne by the client.